The Conventional SDLC

How software is built today, by teams of humans using a familiar set of tools. This is the baseline: every element listed here is something the factory will need to replace, automate, or keep a human in. See PROCESS.md for how this map is used.

Each element is described by:

  • Purpose: why it exists.
  • Artifacts: what it produces.
  • Tools: what teams usually use.
  • Who: the roles involved.
  • Gate: how the team decides the work is good enough to move on. This is where trust is earned today, almost always through a human.

Part 1: The lifecycle phases

The phases run roughly in order, but in practice they loop: every release feeds back into discovery.

1. Discovery and ideation

  • Purpose: decide what problem is worth solving and for whom.
  • Artifacts: problem statement, user research notes, competitor analysis, opportunity sizing, product vision.
  • Tools: Notion, Google Docs, Miro, FigJam, Dovetail, interview recordings, analytics (Amplitude, Mixpanel).
  • Who: founder or product manager, designer, sometimes customers.
  • Gate: stakeholders agree the problem is real and worth the investment.

2. Requirements and specification

  • Purpose: turn the idea into something concrete enough to build.
  • Artifacts: PRD (product requirements document), user stories, acceptance criteria, non-functional requirements (performance, security, scale), scope and out-of-scope list.
  • Tools: Notion, Confluence, Google Docs, Linear or Jira (epics and stories).
  • Who: product manager, with input from engineering and design.
  • Gate: PRD review. Engineering confirms it is feasible; product confirms it is what was meant.

3. Planning and estimation

  • Purpose: decide what gets built, in what order, by whom, and roughly when.
  • Artifacts: roadmap, milestones, epics broken into tickets, estimates, sprint or cycle plan, priorities.
  • Tools: Linear, Jira, GitHub Projects, Shortcut.
  • Who: product manager, engineering lead, the team.
  • Gate: sprint planning or cycle kickoff. The team commits to a scope.

4. UX and UI design

  • Purpose: decide how the product looks and behaves for the user.
  • Artifacts: user flows, wireframes, high-fidelity mockups, prototypes, design system and components.
  • Tools: Figma, FigJam, Storybook.
  • Who: designer, product manager.
  • Gate: design review, sometimes user testing of a prototype.

5. Architecture and technical design

  • Purpose: decide how the system is built before writing large amounts of code.
  • Artifacts: architecture diagrams (system context, containers, components, data flow), technical design doc or RFC, data model and schema, API contracts (OpenAPI, GraphQL schema), technology choices, threat model.
  • Tools: Eraser, Excalidraw, Lucidchart, draw.io, Mermaid, Notion or Confluence for RFCs.
  • Who: tech lead or architect, senior engineers.
  • Gate: design review or RFC approval. Big decisions get recorded as ADRs (see Part 2).

6. Environment and project setup

  • Purpose: give developers a place to work that matches production as closely as possible.
  • Artifacts: repository, branching strategy, monorepo or polyrepo structure, local dev setup (Docker Compose, dev containers), linters and formatters, environment config and secrets, staging and production environments, infrastructure as code.
  • Tools: GitHub or GitLab, Docker, Terraform or Pulumi, cloud provider (AWS, GCP, Azure, Vercel, Fly), secret managers (Doppler, Vault, 1Password).
  • Who: tech lead, DevOps or platform engineer.
  • Gate: a new developer can clone the repo and run the app by following the README.

7. Development

  • Purpose: write the code.
  • Artifacts: feature branches, commits, code, unit tests, inline docs, migrations.
  • Tools: IDE, git, AI coding assistants, package managers.
  • Who: engineers.
  • Gate: the developer believes the ticket is done, local tests pass, and a PR is opened.
  • Conventions involved: coding standards, commit message format (Conventional Commits), branch naming, definition of done.

8. Code review and PR approval

  • Purpose: catch bugs, keep quality and consistency, spread knowledge across the team.
  • Artifacts: pull request with description, linked ticket, review comments, approvals.
  • Tools: GitHub PRs, GitLab MRs, CODEOWNERS, PR templates, automated review bots.
  • Who: one or more peer reviewers, code owners for sensitive areas.
  • Gate: required approvals (usually 1 or 2), all CI checks green, branch protection rules met, conversations resolved.

9. Testing and quality assurance

  • Purpose: prove the software works and keeps working.
  • Artifacts: unit, integration, end-to-end, contract, performance, and accessibility tests; test plans; QA sign-off; bug tickets.
  • Tools: Jest, Vitest, pytest, Playwright, Cypress, k6, test management tools.
  • Who: engineers, QA engineers, sometimes product for acceptance testing.
  • Gate: tests pass, coverage thresholds met, QA or product signs off against acceptance criteria.

10. Security and compliance checks

  • Purpose: make sure the software does not introduce vulnerabilities or break rules the business must follow.
  • Artifacts: dependency scan results, static analysis reports (SAST), secret scans, penetration test reports, compliance evidence (SOC 2, GDPR, HIPAA).
  • Tools: Dependabot, Snyk, CodeQL, Semgrep, Gitleaks, Vanta, Drata.
  • Who: engineers, security team, compliance owner.
  • Gate: no unresolved critical findings; compliance controls satisfied.

11. Build and continuous integration (CI)

  • Purpose: turn source code into a tested, versioned artifact on every change.
  • Artifacts: build outputs (bundles, binaries, Docker images), test reports, version numbers, build logs.
  • Tools: GitHub Actions, GitLab CI, CircleCI, Buildkite, Turborepo or Nx for monorepos, container registries.
  • Who: automated, owned by DevOps or the tech lead.
  • Gate: the pipeline is green.

12. Release and continuous delivery or deployment (CD)

  • Purpose: get the built artifact safely into users' hands.
  • Artifacts: release notes, changelog, tagged versions (semantic versioning), deployment records, feature flags, database migrations applied.
  • Tools: GitHub Actions, Argo CD, Vercel, Netlify, Render, Fly, App Store and Play Store for mobile, LaunchDarkly or similar for feature flags.
  • Who: engineers, release manager, sometimes product for go/no-go.
  • Gate: staging verification, release approval, then staged rollout (canary, blue-green, percentage rollout) with a rollback plan.

13. Operations and monitoring

  • Purpose: know the system is healthy and find out about problems before users do.
  • Artifacts: dashboards, alerts, logs, traces, uptime checks, SLOs and SLAs, on-call schedule, runbooks.
  • Tools: Datadog, Grafana, Prometheus, Sentry, PagerDuty, OpenTelemetry, status pages.
  • Who: on-call engineers, SRE or DevOps.
  • Gate: SLOs met; alerts acknowledged and handled.

14. Incident management

  • Purpose: respond to outages and serious bugs quickly, then learn from them.
  • Artifacts: incident tickets, incident timeline, status page updates, postmortems with action items.
  • Tools: PagerDuty, Opsgenie, incident.io, Slack incident channels.
  • Who: on-call engineer, incident commander, communications owner.
  • Gate: incident resolved, postmortem written, action items turned into tickets.

15. Feedback, analytics and maintenance

  • Purpose: learn how the product is used, fix what's broken, and decide what's next. This closes the loop back to discovery.
  • Artifacts: usage analytics, customer feedback, support tickets, bug reports, dependency upgrades, refactors.
  • Tools: Amplitude, PostHog, Intercom, Zendesk, user interviews, Renovate or Dependabot for upgrades.
  • Who: product manager, support, engineers.
  • Gate: feedback triaged into the backlog.

Part 2: Cross-cutting elements

These are not phases. They run through every phase and hold the project together.

Work tracking (ticket management)

  • Purpose: one place that says what is being worked on, by whom, and why.
  • Artifacts: issues, epics, projects, cycles or sprints, labels, priorities, statuses, links to PRs.
  • Tools: Linear, Jira, GitHub Issues, Shortcut.
  • Conventions: ticket templates (bug, feature, chore), definition of ready, definition of done, workflow states (Backlog → Todo → In Progress → In Review → Done).

Product and technical documentation

  • Purpose: the shared memory of what the product is and how it works.
  • Artifacts: product docs (vision, PRDs, user guides), technical docs (architecture, API reference, data model, setup guides), READMEs, onboarding docs.
  • Tools: Notion, Confluence, docs in the repo (Markdown), docs sites (Docusaurus, Mintlify), generated API docs.
  • Known problem: docs drift out of date because nobody owns keeping them in sync with the code.

Architecture design

  • Purpose: a visual, shared understanding of the system.
  • Artifacts: diagrams at several levels (the C4 model is a common standard: context, containers, components, code), sequence diagrams, infrastructure diagrams, ER diagrams.
  • Tools: Eraser, Excalidraw, Lucidchart, draw.io, Mermaid or PlantUML (diagrams as code).

Technical decision records (ADRs)

  • Purpose: record why a decision was made, so later readers don't repeat the debate or undo it by accident.
  • Artifacts: one short record per decision: context, options considered, decision, consequences, status (proposed, accepted, superseded).
  • Tools: Markdown files in the repo (docs/adr/0001-...md), Notion databases, adr-tools.

Technical debt tracking

  • Purpose: make shortcuts visible so they get paid back deliberately instead of silently piling up.
  • Artifacts: tech debt register or labelled tickets, each with the cost of leaving it and the cost of fixing it, TODO and FIXME comments linked to tickets.
  • Tools: Linear or Jira labels, a debt register doc, code quality tools (SonarQube, CodeClimate).
  • Conventions: a fixed share of each cycle for paying down debt; debt review during planning.

Contribution guidelines

  • Purpose: tell anyone contributing how work is done here.
  • Artifacts: CONTRIBUTING.md, code style guide, branch and commit conventions, PR template, issue templates, CODEOWNERS, code of conduct.
  • Tools: files in the repo, enforced by linters, commit hooks (Husky, lefthook) and branch protection.

Version control and branching strategy

  • Purpose: a safe, traceable history of every change.
  • Artifacts: branches, commits, tags, release branches.
  • Strategies: trunk-based development, GitHub Flow, Git Flow.
  • Tools: git, GitHub, GitLab.

Dependency and configuration management

  • Purpose: control what third-party code and settings the system depends on.
  • Artifacts: lockfiles, environment variable definitions, secrets, feature flag config.
  • Tools: npm, pnpm, uv, Poetry, Renovate, Dependabot, secret managers.

Communication and collaboration

  • Purpose: keep everyone aligned between the formal artifacts.
  • Artifacts: standups, sprint reviews, retrospectives, demos, async updates, meeting notes.
  • Tools: Slack, Google Meet, Zoom, Loom.
  • Known problem: important decisions get made in chat and are never written down.

Roles and ownership

The people a conventional team relies on. In a small team, one person covers several.

RoleOwns
Product managerWhat to build and why; priorities; acceptance
DesignerUser experience and interface
Tech lead or architectTechnical direction, architecture, standards
EngineersImplementation, tests, code review
QA engineerTest strategy, sign-off
DevOps, platform or SREInfrastructure, CI/CD, reliability
Security and complianceRisk, audits, controls
Release managerWhen and how releases go out
SupportUser issues, feedback intake

Part 3: Where humans hold trust today

Almost every gate above is a human judgment. These are the points the factory has to earn the right to automate:

GateHuman decision today
Problem worth solvingFounder or PM judgment
PRD approvalPM and engineering agree on scope
Design and RFC approvalTech lead signs off on the approach
PR approvalPeer reviewer approves the code
QA sign-offQA or PM confirms acceptance criteria
Security reviewSecurity owner accepts the risk
Release go/no-goRelease manager or PM approves
Incident responseOn-call engineer diagnoses and fixes
Backlog triagePM decides what feedback matters

The next step is to map each element and gate in this document onto the factory: what replaces it, what evidence lets us trust that replacement, and where a human stays in the loop.

Follow the research

Occasional notes from the lab as the factory takes shape: what we tried, what worked, and what didn’t.